AECOM has been appointed by MyHSR Corporation Sdn Bhd (MyHSR) for the civil reference design works for the High-Speed Rail infrastructure within Malaysia from the south of Iskandar Puteri Station to the International Border between Malaysia and Singapore, including the Straits of Johor crossing. The Malaysian civil rail infrastructure reference design scope, which covers approximately 335 km, was divided into six Reference Design Consultant (RDC) packages by MyHSR. “The Kuala Lumpur-Singapore H
This content is for Premium Subscribers only. To view this content, login below or subscribe as a Premium Subscriber.