14 May 2009 Europe

55KM BRENNER TUNNEL

The final go-ahead for the construction of the Brenner base tunnel is due to be signed at a meeting of the German, Italian and Austrian transport ministers on 18 May. The 55km tunnel running south from Innsbruck into Italy is to have two single-track bores, plus a drainage tunnel 12m lower than the

This content is for Premium Subscribers only. To view this content, login below or subscribe as a Premium Subscriber.

Premium Content

Related News Articles